Ranta-Tampellankatu 10 – turnkey delivery is as easy as it gets

Ranta-Tampellankatu 10 – turnkey delivery is as easy as it gets

Koja has delivered a fully assembled and tested Future® 1509 air handling unit for an apartment building in Ranta-Tampella in Tampere, Finland. Located near lake Näsijärvi and completed in spring 2023, the building has 62 rental apartments.

AVOIDS ASSEMBLING A JIGSAW PUZZLE

Turnkey deliveries can make project management and logistics easier at construction sites and speed up the schedule. Instead of a conventional module delivery, Koja assembled the air handling unit on a machine frame from start to finish at its Jalasjärvi factory in Finland. Electrical and automation equipment was also installed and tested at the factory. The complete unit was delivered to the construction site and lifted as one piece into the equipment room. 

Petteri Kolkkinen, the ventilation installation manager of the site’s ventilation contractor Quattroservices Tampere Oy, gave positive feedback for the method: 

“Installation was much easier for us thanks to not having to assemble a jigsaw puzzle in the equipment room, so to speak. Separate modules may often be left knocking around in the equipment room for a year, exposed to job site hazards and moved around. Now the unit arrived, stayed clean and intact inside a plastic wrap, and it was not shuffled around.”

EASIER FLOOR CONSTRUCTION IN THE VENTILATION EQUIPMENT ROOM

In addition to installation, the complete unit also made other on-site work easier. 

“Building the ventilation equipment room’s floor was made much easier by the unit being lifted onto load-bearing wheels before the floor had been coated. The wheels allowed the whole unit to be moved by only a few technicians. One half of the floor was coated first, and then we moved the unit onto the coated floor before coating the other half,” says Kolkkinen.

Advantages of a factory-assembled machine frame delivery: 

  • no need to assemble machinery at the site
  • can be lifted whole into the ventilation equipment room
  • easier construction site project management and logistics, speeds up the schedule
  • option to install automation and electrical components at the factory for a truly ready-to-use delivery
  • the pump group may also be included in the delivery and dimensioned using the Future®++ dimensioning program
  • no need for electrical plug connections
  • improves the air handling unit’s tightness

FUTURE® 1509 AIR HANDLING UNIT

  • Air flow rate +2.2/-2.3 m3/s
  • SFP 1.6 kW/(m3/s)
  • EN 308 efficiency: 83% (no preheating)
  • Factory-installed and -tested FxVent automation
  • Pump group included in delivery